The feasibility study and the EIA evaluate a potential conversion of the Oulu paper mill into packaging board production. The feasibility study is expected to be concluded by the end of 2018, and the EIA process is expected to take a minimum of 6 months.
|
SCA is investing SEK 7.8 billion in the operation and the project is on budget and schedule.
|