|
VAREL, Germany , Nov. 21, 2018 (Press Release) -As public holidays during the end of the year 2018 are challenging for logistic reasons (limited transport-/warehouse capacity as well as limited number of loading days), VAREL is going to take downtime on all four machines (Containerboard + Cartonboard) during Xmas and the turn of the year. Furthermore already end of last year projected maintenance services for 2018 have to be completed during these days without production.
Read moreThe association "Jever Aktiv" and trade council of Friesland, Wittmund and the town of Wilhelmshaven honored companies with outstanding achievements on annual basis, one of them Papier- und Kartonfabrik Varel for 2011. Special focus was laid on field of education and environmental protection as well as support of cultural and social projects.
Read moreWith the commissioning of the steam turbine 9, the efficiency of energy production in paper and board mill Varel has been further increased. The steam turbine 9 has an output of 13.9 MW and the steam turbine power generation takes over the 1 and 2 These were taken from the regular operations, but are still available as reserve capacity.
Read moreSome new installed components of the PM 4 are already put into operation or start-up is planned within short time. We would like to point out the following milestones:
Read moreThe technical capacity of this solar plant is 998 kWp, installed on a surface of approx. 18.000 square metre. Within next weeks approx. 8.300 photovoltaic-modules manufactured by Inventux will be installed in row-parallel position.
Read more